Air Assist
· Pressure drop per run · Cumulative node pressure
Grid scale: m / square
Default pipe:
Max velocity: m/s
ΔP limit: kPa/run kPa total
Colour by:
Pressure:
Air Network Planner
100%
Properties
Nodes
Runs
Settings
🗺

Getting started:

1. Click Source to place your compressor
2. Click Draw Pipe and click across the canvas — each click drops a node and extends the line
3. Click an existing node to join into it · press Esc to finish the run
4. Set an air demand on each drop, then click any node or pipe to edit it

Or hit ★ Example to load a worked network.

Load a worked example

Replaces the current network

Import demands from a schedule

Paste outlet rows — nodes are matched by their labels
One line per schedule row, columns separated by tabs (paste straight from Excel) or commas:
refs · flow per item · utilisation — e.g. C13 to C28  350  0.05 sets each of C13…C28 to 350 × 5%.
Or just refs · demand each — e.g. C46  10. Refs may be single (C46), lists (C62 & C63), or ranges (C13 to C28). Utilisation may be a fraction (0.1) or percent (10%).

Keyboard shortcuts

Press ? or Esc to close
SSelect tool
NNode / Drop tool
PDraw Pipe tool
14Colour by Status / Velocity / ΔP-per-run / ΔP-total
+ Zoom in / out
0Reset zoom to 100%
FFit network to view
Ctrl+ZUndo
Ctrl+YRedo
Ctrl+SSave project
Drag on empty canvasBox-select multiple pipe runs (Shift+drag adds to selection)
EscCancel pipe draw / clear selection / close dialog
Del / BackspaceDelete selected node or run
?Show this help

Suggested pipe sizes

Smallest pipe per run keeping total source→outlet drop under budget
Budget: kPa total