Visual pipe network · Pressure drop per run · Cumulative node pressure
Getting started:
1. Click Source to place your compressor
2. Click Draw Pipe and click across the canvas — each click drops a node and extends the line
3. Click an existing node to join into it · press Esc to finish the run
4. Set an air demand on each drop, then click any node or pipe to edit it
Or hit ★ Example to load a worked network.